Clearing lot Brought in fill dirt. Temporary driveway installed. Pilings delivered. Crane has arrived. Crane at work lifting pilings. Pilings are being driven into the ground. Moving right along. Floor trusses delivered. First living floor trusses being installed. First living floor exterior walls being framed. First living floor sheathed and second living floor trusses being set. Slab poured and being smoothed / leveled out. Second living floor exterior walls being framed. Second living floor being sheathed. Roof trusses being installed. Roof being framed. Roof decking installed. Chimney built. Interior walls being framed up. View from the first living floor. Interior stairs framed up. More interior framing. Window cutouts waiting for windows Door Cutouts waiting for doors HVAC Ducts HVAC Ducts Pluming Roughed In Shower / Tub Combo Installed Electrical Roughed In Fuse Box Installed
Ice Shield on roof decking Windows waiting for installation Doors waiting for installation Hardie Board siding going on Windows going in Beautiful metal roof installed
Painting the exterior Serendipity by Sherwin Williams
Drywall installation On walls On ceilings Water resistant drywall in bathrooms Shower Install Tub / Shower Combo Drywall along the stairwell Vanities installed in bathrooms Mini Bar Cabinetry that will be built into the hearth Master Bedroom Armoire Master Bath Vanity Kitchen Cabinets
Exterior painting coming right along Stainless steel cable railings being installed Exterior stairs waiting for handrails Tile flooring being installed Lighting being installed Outdoor shower ready to be used Master Bath: Beautiful backsplash tiles in the kitchen Light fixtures in the stairwell Bunk beds in the bunk room Bathroom looking pretty Table and chairs Bunk room ladder Living room set up