
Clearing lot 
Brought in fill dirt. 
Temporary driveway installed. 
Pilings delivered. Crane has arrived. 
Crane at work lifting pilings. 
Pilings are being driven into the ground. 
Moving right along. 
Floor trusses delivered. 
First living floor trusses being installed. 
First living floor exterior walls being framed. 
First living floor sheathed and second living floor trusses being set. 
Slab poured and being smoothed / leveled out. 
Second living floor exterior walls being framed. 
Second living floor being sheathed. 
Roof trusses being installed. 
Roof being framed. 
Roof decking installed. 
Chimney built. 
Interior walls being framed up. 
View from the first living floor. 
Interior stairs framed up. 
More interior framing. 
Window cutouts waiting for windows 
Door Cutouts waiting for doors 
HVAC Ducts 
HVAC Ducts 
Pluming Roughed In 
Shower / Tub Combo Installed 
Electrical Roughed In 
Fuse Box Installed

Ice Shield on roof decking 
Windows waiting for installation 
Doors waiting for installation 
Hardie Board siding going on 
Windows going in 
Beautiful metal roof installed

Painting the exterior 


Serendipity by Sherwin Williams

Drywall installation 
On walls 
On ceilings 


Water resistant drywall in bathrooms 




Shower Install 
Tub / Shower Combo 
Drywall along the stairwell 
Vanities installed in bathrooms 

Mini Bar 
Cabinetry that will be built into the hearth 
Master Bedroom Armoire 
Master Bath Vanity 
Kitchen Cabinets 


Exterior painting coming right along 
Stainless steel cable railings being installed 
Exterior stairs waiting for handrails 
Tile flooring being installed 

Lighting being installed 

Outdoor shower ready to be used 


Master Bath: 
Beautiful backsplash tiles in the kitchen 
Light fixtures in the stairwell 
Bunk beds in the bunk room 
Bathroom looking pretty 
Table and chairs 
Bunk room ladder 

Living room set up 












