Pre Repair / Remodel![](https://gulf2bayconstruction.com/wp-content/uploads/2020/04/20190621_080625-1030x773.jpg)
Wind damage – removed siding
Roof, fascia and soffit wind damage
Water damaged interior doors
Insulation caught in ventwork
Interior was gutted; however still bits of insulation, etc.
Old vinyl siding being removed![](https://gulf2bayconstruction.com/wp-content/uploads/2020/04/20190621_082126-773x1030.jpg)
Tyvek installed over the plywood
Old windows and doors need to be replace
New doors being installed
As well as new windows
Starting to frame the second floor deck
New Hardie Board siding being installed
New Hardie getting a makeover
New stairs being installed and painted
New Trex decking being installed on deck
New Stainless Steel Cable Railing installed![](https://gulf2bayconstruction.com/wp-content/uploads/2020/04/20200116_104610-1030x501.jpg)
Cable railing down the stairs as well
New insulation blown in
New drywall just waiting to be installed.
New Garage Doors Installed
Tub Installed and Plumbing Stubbed Out
Drywall installed and mudded![](https://gulf2bayconstruction.com/wp-content/uploads/2020/08/20200518_091624-1030x501.jpg)
![](https://gulf2bayconstruction.com/wp-content/uploads/2020/08/20200518_091634-501x1030.jpg)
![](https://gulf2bayconstruction.com/wp-content/uploads/2020/08/20200518_091648-1030x501.jpg)
Tile being installed in the bathrooms![](https://gulf2bayconstruction.com/wp-content/uploads/2020/08/20200605_093315-501x1030.jpg)
![](https://gulf2bayconstruction.com/wp-content/uploads/2020/08/20200605_093333-501x1030.jpg)
New Light Fixtures Installed![](https://gulf2bayconstruction.com/wp-content/uploads/2020/08/20200730_124354-1030x501.jpg)
![](https://gulf2bayconstruction.com/wp-content/uploads/2020/08/20200730_124511-1030x501.jpg)
Cabinets & Appliances![](https://gulf2bayconstruction.com/wp-content/uploads/2020/10/20200902_093912-1030x501.jpg)
![](https://gulf2bayconstruction.com/wp-content/uploads/2020/10/20200902_093924-501x1030.jpg)
Mirrors
Shelving
Wash Tub in Garage
Installing slats. White paint next.
![](https://gulf2bayconstruction.com/wp-content/uploads/2020/12/20201103_114953-1030x501.jpg)
Tile Backsplash installed in kitchens
New pavers installed![](https://gulf2bayconstruction.com/wp-content/uploads/2020/12/20201110_110600-1030x501.jpg)
![](https://gulf2bayconstruction.com/wp-content/uploads/2020/12/20201110_110609-501x1030.jpg)
![](https://gulf2bayconstruction.com/wp-content/uploads/2020/12/20201118_104950-501x1030.jpg)
New Tile Showers
With New Glass Doors