Gulf 2 Bay Development & Construction LLC
  • Facebook
  • Mail
  • Home
  • Moonsail
  • Summer Escape
  • ConchQuest
  • Tranquil Shores
  • Shallow Reed
  • Gulf Harmony
  • Hurricane
  • Gulf Breeze & Summer Wind
  • Six Pack
  • Wil & Chris
  • Remodels
  • Older Builds
  • Projects
  • Lost Week Inn
  • Livin’ The Dream
  • Blue Moon
  • Best Time of the Year
  • Boardwalks & Walkways
  • Money Bayou
  • Cooper’s Nest
  • Community
  • Company
  • Contact
  • Search
  • Menu
  • Clearing lot
  • Brought in fill dirt.
  • Temporary driveway installed.
  • Pilings delivered. Crane has arrived.
  • Crane at work lifting pilings.
  • Pilings are being driven into the ground.
  • Moving right along.
  • Floor trusses delivered.
  • First living floor trusses being installed.
  • First living floor exterior walls being framed.
  • First living floor sheathed and second living floor trusses being set.
  • Slab poured and being smoothed / leveled out.
  • Second living floor exterior walls being framed.
  • Second living floor being sheathed.
  • Roof trusses being installed.
  • Roof being framed.
  • Roof decking installed.
  • Chimney built.
  • Interior walls being framed up.
  • View from the first living floor.
  • Interior stairs framed up.
  • More interior framing.
  • Window cutouts waiting for windows
  • Door Cutouts waiting for doors
  • HVAC Ducts
  • HVAC Ducts
  • Pluming Roughed In
  • Shower / Tub Combo Installed
  • Electrical Roughed In
  • Fuse Box Installed
  • Ice Shield on roof decking
  • Windows waiting for installation
  • Doors waiting for installation
  • Hardie Board siding going on
  • Windows going in
  • Beautiful metal roof installed
  • Painting the exterior
  • Serendipity by Sherwin Williams
  • Drywall installation
  • On walls
  • On ceilings
  • Water resistant drywall in bathrooms
  • Shower Install
  • Tub / Shower Combo
  • Drywall along the stairwell
  • Vanities installed in bathrooms
  • Mini Bar
  • Cabinetry that will be built into the hearth
  • Master Bedroom Armoire
  • Master Bath Vanity
  • Kitchen Cabinets
  • Exterior painting coming right along
  • Stainless steel cable railings being installed
  • Exterior stairs waiting for handrails
  • Tile flooring being installed
  • Lighting being installed
  • Outdoor shower ready to be used
  • Master Bath:
  • Beautiful backsplash tiles in the kitchen
  • Light fixtures in the stairwell
  • Bunk beds in the bunk room
  • Bathroom looking pretty
  • Table and chairs
  • Bunk room ladder
  • Living room set up

      Contact Us

      Gulf 2 Bay Development & Construction
      341 South MacArthur Ave
      Panama City, Florida 32401
      CBC 1259941

      Phone: 850.527.5794

      Email: admin@gulf2bayconst.com

      Connect with Us

      Gulf 2 Bay Development and Construction

      OUR PROJECTS

      • Projects
        • Watch Us Build
        • Happy Customers
      © 2017 - Gulf to Bay Construction | Maintained by www.thewriteonecs.com
      • Facebook
      • Mail
      Scroll to top